NAM THEUN 1 HYDRO POWER

NT 09.jpg

Project Overview

TLEC Engineering participated in the design and tender process for the log boom system at the Nam Theun 1 Hydropower Project. This project involved the engineering design of a single-span log boom system with a total length of 719 meters. Due to the extended span and site conditions, the project required detailed structural analysis, load calculations, and anchoring design to ensure long-term performance and stability. The 719-meter single span represents one of the longest continuous log boom configurations undertaken, demonstrating TLEC Engineering’s capability in large-scale hydropower engineering works.

Scope of Work

  • Conduct site study and preliminary assessment

  • Perform engineering design and system configuration

  • Structural and tensile load analysis for long-span log boom system

  • Design of reinforced concrete anchor blocks (left and right abutments)

  • Preparation of technical drawings and specifications

  • Preparation of technical proposal and tender documentation

  • Cost estimation and project planning for tender submission

Project Information

Project Name: Nam Theun 1 Hydropower Project

Location: Bolikhamsai Province, Lao PDR

Owner: Nam Theun 1 Power Company Limited (NT1PC)

Installation Year: 2021

Log Boom Locations: 1 Locations 

Total Installed Length: 719 meters

Main Dam

Installation:  August 2021

Length of Log Boom: 719 meters

No. of Span: 1