top of page
NH 01.jpg

Project Overview

TLEC Engineering was appointed to carry out the installation of the log boom system at the Nam Che 1 Hydropower Project.

This project involved a new installation, including the supply and installation of a complete log boom system to regulate floating debris and enhance operational safety within the hydropower facility.

Scope of Work

  • Conduct site inspection and assessment prior to installation

  • Prepare engineering plan and define system configuration

  • Supply TLEC log boom system in accordance with project requirements

  • Carry out installation of the log boom system in compliance with technical standards

  • Supervise installation works and manage on-site safety control

Project Information

Project Name: Nam Che 1 Hydropower Project

Location: Xaisomboun Province, Lao PDR

Owner: B.Grimm Power Co., Ltd.

Installation Year: 2018

Log Boom Locations: 1 Locations 

Total Installed Length: 200 meters

Nam Che 1

Installation:  December 2018

Length of Log Boom: 200 meters

No. of Span: 1

bottom of page