1st step Assembly net with main rope
Anchor mesh Polyethylene mesh to the rope core using small rope size Ø4 mm. Put a small rope size Ø9 mm. The rope stand during the middle rope with a rope by a distance of approx. 2 meters, all the work is performed at the factory for the convenience. The duration of the average knitted approximately 40 m. / Day
2nd step Assembly float with net
The duration of the average approximately 40 floats / Day.
3rd step Assembly ballast weight with main bottom rope.
Polyethylene mesh is assembled with the main bottom rope and Ballast weight (chain or concrete weight).
4th step Storage for transportation.