top of page
NL1PC logo

Nam Lik 1 HPP is located 90 km north of Vientiane , Laos, downstream from the Nam Lik 1-2 dam. It was designed to regulate the outflow within the river as an environmental protection measure.

Installed Capacity

64.5MW

Developer

EDL-Generation Public;

Global Power Synergy Public;

Hydro Engineering;

POSCO Engineering & Construction

Start of Construction

2014

Nam Lik 1

Installation :  December 2018

Length of Log Boom : 200 meters

No. of Span : 1

bottom of page