Project Overview
TLEC Engineering was appointed to carry out the installation of the log boom system at Nam Lik 1 Hydropower Project.
The project involved the supply and installation of a complete log boom system to regulate floating debris and enhance operational safety within the hydropower facility.
Scope of Work
-
Conduct site inspection and assessment prior to installation
-
Prepare engineering plan and define system configuration
-
Supply TLEC log boom system in accordance with project requirements
-
Execute installation of the log boom system in compliance with technical standards
-
Supervise installation works and manage on-site safety control
Project Information
Project Name: Nam Lik 1 Hydropower Project
Location: Lao PDR (90 km north of Vientiane)
Owner: Nam Lik Power 1 Co., Ltd. (NL1PC)
Installation Year: 2018
Log Boom Locations: 1 Locations
Total Installed Length: 200 meters