top of page

Project Overview

TLEC Engineering was appointed to carry out the installation of the log boom system at Nam Lik 1 Hydropower Project.

The project involved the supply and installation of a complete log boom system to regulate floating debris and enhance operational safety within the hydropower facility.

Scope of Work

  • Conduct site inspection and assessment prior to installation

  • Prepare engineering plan and define system configuration

  • Supply TLEC log boom system in accordance with project requirements

  • Execute installation of the log boom system in compliance with technical standards

  • Supervise installation works and manage on-site safety control

Project Information

Project Name: Nam Lik 1 Hydropower Project

Location: Lao PDR (90 km north of Vientiane)

Owner: Nam Lik Power 1 Co., Ltd. (NL1PC)

Installation Year: 2018

Log Boom Locations: 1 Locations 

Total Installed Length: 200 meters

Nam Lik 1 HPP

Installation:  December 2018

Length of Log Boom: 200 meters

No. of Span: 1

bottom of page